The same tiles, patterns
and designs can be used outside as those
used internally.
External Path Laying Procedures
-
The Classic Victorian Tiling
Company's install the front paths
in the same way as the Victorians did over
a hundred years ago, apart from the fact
that most paths were laid on brick ash and
shaky foundations which is why some have
cracked, come loose and disintergrated.
The only difference in our method of installation
is that we put at least a 4.5 inch concrete
foundation down first before applying a
sand and cement screed to which the tiles
are then bedded. So there is no reason our
paths will not be around long after we are
not.
|